Cold ironing in the Port of Piraeus

PROJECT ACRONYM

CIPORT

PROGRAMME

CEF PROGRAMME - European Climate Infrastructure and Environment Executive Agency
https://cinea.ec.europa.eu/index_en

PROJECT TITLE

Cold ironing in the Port of Piraeus – Taking the Final Step

DURATION

01/08/2021 – 29/02/2024

PROJECT TOTAL BUDGET

€ 1.376.000

FUNDING

50% EU contribution

PROJECT SUMMARY

The Action addresses the Core maritime Port of Piraeus, located on the Orient East-Med Core Network Corridor. It is part of the Global project which aims to transform the Port of Piraeus into a Green Cruise Hub. The Action aims to provide the final studies and engineering designs for the development of on-shore power supply (OPS) technology for four cruise vessels positions at the Themistoklis coast in the core maritime Port of Piraeus.

PROJECT OBJECTIVES

The Action includes the elaboration of the following main studies:

  • Technical studies for the installation of OPS for the four identified cruise vessels positions, including the infrastructure that will allow the connection of the Port’s grid to the city's local grid
  • Technical requirements and operational procedures for the electric connection and power provision to cruise vessels by the Port
  • Environmental studies required for the installation and operation of the OPS system
  • A Cost-Benefit Analysis
  • A study for the appropriate commercial model for the electricity supply to cruise vessels as well as a calculation of the appropriate pricing methodology
  • Tender documents for the subsequent works

The completion of the Action will lead to the launch of the tender for the subsequent works after the Action’s end.

PROTASIS SCOPE

In the framework of the CIPORT project, PROTASIS S.A. performs the Front End Engineering (FEED) studies for the Shore Side Electricity (SSE) infrastructure for the port of Piraeus extending the currently planned SSE position at the passenger terminal, to the cruise terminal. Specifically, the FEED studies will include provision for the creation of four (4) SSE positions that will serve cruise ships and cover the main primary and secondary electrical equipment, the specification for the most suitable Cable Management System (CMS) arrangements, cost estimation for procurement and erection of the future SSE, and the technical design studies providing planning design, final specifications for equipment and infrastructure (in line with the international standards IEC 80005-1/2/3) and ensuring the port-to-vessel interconnection compatibility.

PARTNERS

Lead Partner: Piraeus Port Authority SA

  • HEDNO SA - Hellenic Electricity Distribution Network Operator SA
  • PROTASIS SA
  • HYDRUS Engineering SA
  • National Technical University of Athens
  • GATES – Global Transport and Engineering Systems